<?php
|
|
require_once("../lib/phpchartdir.php");
|
|
|
|
# the names of the tasks
|
|
$labels = array("Market Research", "Define Specifications", "Overall Archiecture",
|
|
"Project Planning", "Detail Design", "Software Development", "Test Plan",
|
|
"Testing and QA", "User Documentation");
|
|
|
|
# the planned start dates and end dates for the tasks
|
|
$startDate = array(chartTime(2004, 8, 16), chartTime(2004, 8, 30), chartTime(2004, 9,
|
|
13), chartTime(2004, 9, 20), chartTime(2004, 9, 27), chartTime(2004, 10, 4),
|
|
chartTime(2004, 10, 25), chartTime(2004, 11, 1), chartTime(2004, 11, 8));
|
|
$endDate = array(chartTime(2004, 8, 30), chartTime(2004, 9, 13), chartTime(2004, 9,
|
|
27), chartTime(2004, 10, 4), chartTime(2004, 10, 11), chartTime(2004, 11, 8),
|
|
chartTime(2004, 11, 8), chartTime(2004, 11, 22), chartTime(2004, 11, 22));
|
|
|
|
# the actual start dates and end dates for the tasks up to now
|
|
$actualStartDate = array(chartTime(2004, 8, 16), chartTime(2004, 8, 27), chartTime(
|
|
2004, 9, 9), chartTime(2004, 9, 18), chartTime(2004, 9, 22));
|
|
$actualEndDate = array(chartTime(2004, 8, 27), chartTime(2004, 9, 9), chartTime(2004,
|
|
9, 27), chartTime(2004, 10, 2), chartTime(2004, 10, 8));
|
|
|
|
# Create a XYChart object of size 620 x 280 pixels. Set background color to light
|
|
# green (ccffcc) with 1 pixel 3D border effect.
|
|
$c = new XYChart(620, 280, 0xccffcc, 0x000000, 1);
|
|
|
|
# Add a title to the chart using 15 points Times Bold Itatic font, with white
|
|
# (ffffff) text on a dark green (0x6000) background
|
|
$textBoxObj = $c->addTitle("Mutli-Layer Gantt Chart Demo", "timesbi.ttf", 15,
|
|
0xffffff);
|
|
$textBoxObj->setBackground(0x006000);
|
|
|
|
# Set the plotarea at (140, 55) and of size 460 x 200 pixels. Use alternative
|
|
# white/grey background. Enable both horizontal and vertical grids by setting their
|
|
# colors to grey (c0c0c0). Set vertical major grid (represents month boundaries) 2
|
|
# pixels in width
|
|
$plotAreaObj = $c->setPlotArea(140, 55, 460, 200, 0xffffff, 0xeeeeee, LineColor,
|
|
0xc0c0c0, 0xc0c0c0);
|
|
$plotAreaObj->setGridWidth(2, 1, 1, 1);
|
|
|
|
# swap the x and y axes to create a horziontal box-whisker chart
|
|
$c->swapXY();
|
|
|
|
# Set the y-axis scale to be date scale from Aug 16, 2004 to Nov 22, 2004, with ticks
|
|
# every 7 days (1 week)
|
|
$c->yAxis->setDateScale(chartTime(2004, 8, 16), chartTime(2004, 11, 22), 86400 * 7);
|
|
|
|
# Add a red (ff0000) dash line to represent the current day
|
|
$c->yAxis->addMark(chartTime(2004, 10, 8), $c->dashLineColor(0xff0000, DashLine));
|
|
|
|
# Set multi-style axis label formatting. Month labels are in Arial Bold font in "mmm
|
|
# d" format. Weekly labels just show the day of month and use minor tick (by using
|
|
# '-' as first character of format string).
|
|
$c->yAxis->setMultiFormat(StartOfMonthFilter(), "<*font=arialbd.ttf*>{value|mmm d}",
|
|
StartOfDayFilter(), "-{value|d}");
|
|
|
|
# Set the y-axis to shown on the top (right + swapXY = top)
|
|
$c->setYAxisOnRight();
|
|
|
|
# Set the labels on the x axis
|
|
$c->xAxis->setLabels($labels);
|
|
|
|
# Reverse the x-axis scale so that it points downwards.
|
|
$c->xAxis->setReverse();
|
|
|
|
# Set the horizontal ticks and grid lines to be between the bars
|
|
$c->xAxis->setTickOffset(0.5);
|
|
|
|
# Use blue (0000aa) as the color for the planned schedule
|
|
$plannedColor = 0x0000aa;
|
|
|
|
# Use a red hash pattern as the color for the actual dates. The pattern is created as
|
|
# a 4 x 4 bitmap defined in memory as an array of colors.
|
|
$actualColor = $c->patternColor(array(0xffffff, 0xffffff, 0xffffff, 0xff0000,
|
|
0xffffff, 0xffffff, 0xff0000, 0xffffff, 0xffffff, 0xff0000, 0xffffff, 0xffffff,
|
|
0xff0000, 0xffffff, 0xffffff, 0xffffff), 4);
|
|
|
|
# Add a box whisker layer to represent the actual dates. We add the actual dates
|
|
# layer first, so it will be the top layer.
|
|
$actualLayer = $c->addBoxLayer($actualStartDate, $actualEndDate, $actualColor,
|
|
"Actual");
|
|
|
|
# Set the bar height to 8 pixels so they will not block the bottom bar
|
|
$actualLayer->setDataWidth(8);
|
|
|
|
# Add a box-whisker layer to represent the planned schedule date
|
|
$boxLayerObj = $c->addBoxLayer($startDate, $endDate, $plannedColor, "Planned");
|
|
$boxLayerObj->setBorderColor(SameAsMainColor);
|
|
|
|
# Add a legend box on the top right corner (595, 60) of the plot area with 8 pt Arial
|
|
# Bold font. Use a semi-transparent grey (80808080) background.
|
|
$b = $c->addLegend(595, 60, false, "arialbd.ttf", 8);
|
|
$b->setAlignment(TopRight);
|
|
$b->setBackground(0x80808080, -1, 2);
|
|
|
|
# output the chart
|
|
header("Content-type: image/png");
|
|
print($c->makeChart2(PNG));
|
|
?>
|